VICTORIA POINT - Docklands Melbourne
Large diameter bored piles and deep CFA Piling
Value: $4.2M
Client: Multiplex Constructions

Date:

Completed January 2004
 
Back to Top
YARRA'S EDGE DOCKLANDS - Towers 4 & 5
Up to 50m deep concrete injected CFA piling
 
Value: $5M (Towers 4 & 5 combined)
Client: Mirvac Constructions

Date:

Completed Tower 4 2002, Tower 5 2003
Back to Top
EUREKA TOWER SOUTHBANK
Deep, large diameter bored and concrete injected CFA piling
Value: $10.7M
Client: Grocon Pty Ltd

Date:

Completed March 2002
 
Back to Top
FRESHWATER PLACE SOUTHBANK
Deep large diameter bored piles and concrete injected CFA foundation and secant pile retaining wall piling
Value: $8.1M
Client: Australand

Date:

Completed 2002
 
Back to Top
BEACON COVE - Port Melbourne
Concrete injected CFA and screw piling
Value: $2.3M
Client: Mirvac Constructions

Date:

Completed 2004
 
Back to Top  
333 COLLINS STREET - Melbourne
2.5m diameter bored piles to 45m depth
 
Value: $1M
Client: Becton

Date:

1988
 
Back to Top
MELBOURNE CONVENTION CENTRE
CFA foundation piles, slurry cut-off wall, site retention, jet grout ground improvement
Value: $14.5M
Client: Multiplex Constructions

Date:

Completed 2006
 

Construction of the new Melbourne Convention Centre (MCC) Project commenced in June 2006 and comprised the development of a new Convention Centre and hotel complex adjoining, and integrated with, the existing Melbourne Exhibition Centre on the southern edge of the Melbourne CBD. The new Convention Centre is to be a world class facility comprising a 5,000 seat plenary hall, banquet hall with a capacity to accommodate 1,500 delegates, a range of large and medium sized meeting rooms, substantial public and pre-function foyer areas and back of house facilities. Associated facilities to be incorporated within the New Convention Centre include a 24 storey Hotel complex, VIP and speakers rooms, green rooms, business centre, press room, prayer room, concierge and luggage rooms.

In-ground works carried out by Vibro-pile:


1,400 # high capacity, concrete injected CFA foundation piles up to 42m deep.


400 # concrete injected CFA retention piles for permanent and temporary earth retention structures.


1km # of slurry cut-off wall up to 16m deep to protect the surrounding ground water table.

100 # Ground Anchors


300 # Jet Grout columns for road stabilisation works.